A Supplement Store, Rebuilt In Code
Unleashed Sports Nutrition has sold supplements in New Mexico since 2006, out of two stores and a delivery van. CheatCode built them nine custom-coded pages, an animated brand world, a stack-building tool that mirrors what the staff say at the counter, and a business portal to run the whole operation.
The store behind the build
Corey Cipta has run Unleashed since 2006. Two locations: Southern Blvd in Rio Rancho and Menaul Blvd in Albuquerque. ABQ The Magazine named it Best Nutrition Shop in 2020, 2021 and 2023. Free same-day delivery covers both cities. Customers have left 821 Google reviews at a 4.9-star average, and that number belongs to the store and the people behind the counter. No website earned it.
So the job was never to build a reputation. It was to put an existing one online in a form that matched it. Most supplement sites are the same template with a different logo dropped in the corner. Unleashed already had a look of its own: brand red, steel, a bulldog. The site had to carry that, not sand it down to fit somebody else's layout.
Brand system and Forge Cinema
The visual system came out of Corey's real branding rather than a mood board. Brand red, diamond-plate steel textures, the bulldog mark. Anton for headlines, Space Grotesk for body copy, JetBrains Mono for data and labels. The first load of a session opens with a brand splash, once, then leaves the visitor alone for the rest of the session.
Behind the pages runs Forge Cinema, a custom six-layer animated background written for this build. It renders at reduced resolution and upscales to hold frame rate, so the atmosphere does not cost the visitor a smooth scroll. Anyone browsing with reduced-motion enabled gets a single static frame instead of the animation.
- Rolling smoke and light beams
- Drifting forge light and a chrome sheen sweep
- Spark bursts with gravity and particle trails
- A heat light that follows the cursor
Stack Builder: the counter conversation, in software
Every day someone walks in and asks what they should be taking. The staff ask two questions back — what are you training for and what are you spending — then start pulling bottles off the shelf. Stack Builder is that exchange written down. A customer picks a goal and a budget and gets the combination the staff would actually hand them, with the subscribe-and-save discount already applied.
That is the piece a page builder cannot produce, because it only exists as a result of how this specific store already operates. The Shop sits next to it with the full product catalog, category filters and the same subscription pricing, so a customer can either be guided to a stack or go find exactly what they came for.

The portal on the back half
Staff and customers come through separate doors. The login splits two ways, team and member, and each side lands somewhere built for it. Behind the team door is inventory management with tap-to-type stock counts, built for someone standing in the aisle with a phone rather than sitting at a desk.
The portal is currently running in demo mode against sandbox data while the store's real numbers get wired in. Every screen, workflow and permission boundary is built. What it is waiting on is live data, not more code.
- Orders and deliveries
- Subscriptions and customer CRM
- Reviews, campaigns and bookings
- Inventory with tap-to-type counts
Nine pages, and the checks that keep them working
The public site is Home, Shop, Stack Builder, Peptides and GLP-1, Challenge, Learn/University, Athletes and Locations, plus the Portal. Each one is hand-coded, so nothing on the site is carrying weight it does not need.
Keyboard navigation works throughout and reduced-motion preferences are respected rather than ignored. A regression suite of roughly 200 automated checks runs across every role, both modes and multiple screen widths. When one page changes, the suite catches whatever quietly broke somewhere else before a customer finds it.
Stack Builder takes the conversation that happens at the counter every day and turns it into software: pick a goal, set a budget, get the combination the staff would actually pull off the shelf, subscribe-and-save applied.
What the build does
Questions, answered
Could you build something like Stack Builder for my business?
Usually, yes. Stack Builder was not a feature off a list, it came from watching how the store already sells. Most businesses have one conversation they repeat all day: sizing, quoting, matching a customer to the right option. That conversation is the tool. We find it on the call, then build it as software instead of another contact form.
How long does a build like this take, and what happens after launch?
Most CheatCode builds live in two to four weeks. Hosting, SSL and support are included after launch, and there is no contract holding you to anything. Brady Smith writes the code and runs the calls, so the person you talk to about a change is the person making it.
Do I need finished branding before you start?
No, but bring whatever you have. Unleashed already had a red, a bulldog and a steel look, and the site was built out from those rather than around them. If your branding is thinner than that, we build the system as part of the project. Either way nothing here comes from a template or a page builder.
Keep going
Your turn
Tell us the conversation your business repeats every day and we will show you what it looks like as software. Custom-coded, live in two to four weeks, no contract.